2014年1月24日星期五

british interlock hose fittings Three valve

Three valve from the valve body, two cut-off valve and a balancing valve components. Differential pressure

transmitter into operation parher jic hose fittings when the program is running: First, open the drain valve on the two differential

pressure transmitter, and then open the balancing valve, then slowly open the two valves, the air pressure

guide tube or dirt exclusion away, parher british interlock hose fittings close two drain valve, balance valve closed again, the transmitter can be

put into operation. Zero differential pressure transmitter verification procedures: first open balancing

valve, closed two valves, parher metric hose fittings can be
On the transmitter zero calibration. Three valves can be equipped with: 3051,3095,1151, EJA, FX-2, FCX-A / C

and Honeywell ST3000 series transmitters.

没有评论: